Vallecitos Nuclear Center // Sunol, California
A new chapter at Vallecitos
At the Vallecitos Nuclear Center, Zeno Power is establishing a radiological operations center to produce radioisotope power systems for missions from the deep ocean to deep space. We’re refurbishing existing shielded infrastructure, known as hot cells, to build compact systems that provide steady power for years.
Explore our work, meet our team, and learn how we’re preparing for safe operations.
01 // The facility
Built for this work
Vallecitos has specialized radiological infrastructure and an experienced workforce with a long history of working with radioactive materials. Zeno is investing in the refurbishment of its existing hot cells to establish production capabilities for radioisotope power systems. This investment preserves valuable technical infrastructure and creates new opportunities for skilled professionals in the Tri-Valley and beyond.
02 // The hot cells
How hot cells work
Hot cells are thick-walled, shielded rooms with controlled ventilation, built for the safe handling of radioactive materials. Zeno’s work inside the hot cells is conducted remotely through lead-glass windows using mechanical arms, and our operators do not directly handle the radioactive materials.

An existing hot cell at Vallecitos. Zeno has begun non-radiological refurbishment work to prepare its initial hot cells for future operations.
03 // Zeno at Vallecitos
Vallecitos Nuclear Center site overview
Vallecitos is a 1,600-acre nuclear center owned by NorthStar Group Services, which is decommissioning the site’s reactors and other facilities. The existing hot cell building that Zeno leases and is refurbishing to produce radioisotope power systems has long been used for nuclear research.

The Vallecitos Nuclear Center in Sunol
NorthStar
Site ownership and decommissioning
NorthStar acquired Vallecitos in March 2025 to accelerate decommissioning of the site’s reactors and prepare the property for future commercial or industrial use. As part of that transition, NorthStar preserved the existing hot cell building that Zeno now leases.
Zeno Power
Radioisotope power system production
Zeno is refurbishing the hot cell building for radioisotope power system production. We do not lease or operate the site’s reactors. Our work does not affect NorthStar’s decommissioning of the rest of the site.
What Zeno builds here
01
Radioisotope power systems
Compact systems that convert heat from the natural decay of radioactive material into electricity. They provide steady power for years without refueling.
02
Starting with the deep ocean
Initial production at Vallecitos will focus on strontium-90 power systems for undersea applications, including seafloor sensors.
03
Power for demanding missions
Our power systems are designed for environments where conventional energy sources fall short, from the deep ocean to space.
See the technology04 // Safety and oversight
Safety at every layer
Hot cells have been used to handle radioisotopes at Vallecitos for decades. Zeno is preparing its facilities, equipment, procedures, and team for safe radiological operations, combining shielded infrastructure, trained operators, radiation protection measures, and regulatory oversight.
Infrastructure
Shielded hot cells
Zeno is refurbishing and qualifying the existing hot cells for its planned operations, with upgrades designed to meet applicable codes and requirements.
Oversight
Regulatory oversight
Zeno holds a radioactive materials license issued by the California Department of Public Health (CDPH), an NRC Agreement State regulator.
People
Qualified operators
Every hot cell operator must complete extensive training in radiation protection, equipment, and operating procedures. They are evaluated and qualified for the operations they perform.
Procedures
Radiation protection
Everyone entering Zeno’s areas is monitored. Anyone entering a radiation area uses a personal dosimeter to measure radiation exposure. Dose records are kept as required by regulation.
Product
Engineered containment and shielding
Zeno’s power systems incorporate containment and shielding designed for the radioactive material and the system’s intended application.
Environment
Environmental controls and monitoring
Zeno’s planned radiological operations will be subject to environmental and regulatory limits established to protect public health and the environment. Zeno will routinely monitor and evaluate its operations to verify compliance.
05 // People
The people behind the work
Zeno’s work at Vallecitos is in experienced hands. It is led by nuclear professionals with decades of experience in nuclear operations and highly regulated environments, working alongside people who have years of firsthand experience at Vallecitos.

Jon Okert
Vice President of Radiological Operations
Leads Zeno’s radiological operations, bringing more than 25 years of experience in nuclear energy and highly regulated environments. Most recently, he was responsible for radiological facility operations supporting the Nuclear Navy.

John Krueger
Lead, Radiological Infrastructure
Leads Zeno’s radiological infrastructure work, drawing on four decades of experience supporting complex nuclear and radiological projects for the Department of Energy and the nuclear security community.
Watch John’s story
Juan Ayala
Transition Manager, Radiological Operations
Manages the transition of radiological operations, bringing firsthand knowledge of Vallecitos from his 35+ years of work at the site.
Jobs in the Tri-Valley
50+ skilled jobs
Zeno plans to create more than 50 skilled engineering and operations jobs in the Tri-Valley over the next three years. We’re building a team that draws on the region’s technical talent and the experience of the existing Vallecitos workforce.
Building on the region’s nuclear expertise
The Tri-Valley has a deep base of nuclear expertise, research institutions, and engineering talent. Zeno’s investment creates opportunities for experienced professionals and the next generation of technical talent to build their careers here.
06 // History
Vallecitos through the years
Vallecitos has supported nuclear research and technology development since the 1950s. Its history includes both reactor operations and specialized work with radioactive materials.
Vallecitos history
1957
Vallecitos becomes home to the first privately owned nuclear power plant to deliver significant electricity to a public grid.
1957 to 1963
The Vallecitos Boiling Water Reactor serves as a test bed for fuel, controls, and operator training for the Dresden plant in Illinois.
1963
The Vallecitos Boiling Water Reactor shuts down permanently. Work in the site’s hot cells continues for decades afterward.
1965 to 1975
The site hosts research for the Atomic Energy Commission’s nuclear energy program.
1981 to 1982
The site performs additional government-contracted research for the Department of Energy.
2025
NorthStar acquires Vallecitos to accelerate reactor decommissioning and preserves the existing hot cell building for future use.
Zeno at Vallecitos
2026
Zeno leases the hot cell building from NorthStar and begins non-radiological work to refurbish it.
Next
Zeno’s radiological operations will begin, in accordance with its state license.
2027
Zeno plans to begin fabrication of radioisotope power systems for government customers.
07 // FAQ
Frequently asked questions
Zeno is refurbishing the site’s existing hot cells to produce radioisotope power systems, also known as nuclear batteries. The facility will initially produce systems fueled by strontium-90 for undersea applications.
No. Radioisotope power systems generate electricity using heat from the steady, natural decay of radioisotopes. They do not use a controlled nuclear chain reaction. Zeno does not lease or operate the reactors at Vallecitos.
Zeno has begun non-radiological work to refurbish the facility. Radiological operations will begin in accordance with Zeno’s state license, and in 2027 Zeno plans to begin fabrication of radioisotope power systems for government customers.
NorthStar owns the wider Vallecitos site and manages reactor decommissioning. Questions about decommissioning or other areas of the property should be directed to NorthStar.
Yes. NorthStar continues to decommission the site’s reactors and other facilities. The existing hot cell building has been preserved for reuse, and Zeno leases that building for its planned radioisotope power system production. These are separate activities at the same site. Contact NorthStar
Current openings in Sunol are listed on our careers page.
08 // Community
We’re here to answer your questions
We recognize that neighbors have questions about Zeno’s plans and how they relate to decommissioning at Vallecitos. We welcome questions about our work, our planned operations, and our role at the site. Zeno participates in meetings with the Sunol Citizens’ Advisory Council and is a member of Innovation Tri-Valley, a regional economic development organization.
Public meetings
Find a community meeting
Upcoming Sunol Citizens’ Advisory Council meetings are posted on the county’s calendar.
Meeting calendarThe wider site
Questions about decommissioning
For questions about decommissioning and plans for the wider property, contact NorthStar, the site owner.
Contact NorthStar